What this covers
Typical applications include feeder, transformer, generator, motor and busbar protection, in hardwired or IEC 61850 schemes.
- Protection function selection and configuration.
- Entry of calculated and approved protection settings.
- Programmable logic and function-block development.
- Binary and analog signal assignments, where supported.
- Trip, alarm, blocking and permissive logic.
- Interlocking and control logic within the agreed scope.
- Setting-group configuration for defined operating modes.
- Relevant event and disturbance-recording configuration.
- IEC 61850 datasets and GOOSE interfaces where applicable.
- Review and modification of existing configuration files.
Calculation of new settings and wider network coordination studies are included where explicitly specified; configuration work alone does not replace those studies.
Typical inputs
- Relay manufacturer, model and firmware.
- Existing configuration files, where available.
- Protection philosophy and approved settings.
- Single-line diagrams and relevant schematics.
- I/O schedules and signal requirements.
- Required operating modes and control sequences.
What you receive
- Relay configuration project or export files in the agreed format.
- Settings schedules and configuration revision information.
- Logic diagrams or functional documentation.
- I/O and signal mapping relevant to the scope.
- Communication mapping where included.
- A record of assumptions and required verification steps.
Configuration deliverables are issued for the agreed review and testing process. Deployment to operational equipment requires the applicable approvals, backups and verification activities.
Standards and references
Configuration and logic work references IEC 60255 for relay performance, IEC 61850 for station communications, and the applicable IEEE C37 series for scheme practice, alongside your project specification and any utility grid code that applies.
Related services
Relay Settings Calculations & Coordination
Setting calculations and coordination studies assessing sensitivity, selectivity and operating times.
Protection Philosophy & Scheme Development
Protection objectives, functions, operating principles and coordination requirements for the whole project.
IEC 61850 Engineering
Station bus design, SCL engineering and GOOSE schemes across multi-vendor systems.
Protection System Modernization & Upgrades
Assessment and detailed engineering for aging protection systems, obsolete relays and revised protection requirements.
Protection Incident Analysis
Investigation of unwanted trips and failures to operate from disturbance records, event logs, settings and logic.
Need relay configuration scoped?
Work directly with the engineers doing the analysis — clear scoping from the first conversation.
Get in Touch