What this covers
- Main-Tie-Main (3-in-2) — open, closed and fast transition with bus dead-time grading and priority return.
- Multi-source and multi-tie logic — 4-in-2 and 3-in-1 arrangements across utility feeds, standby generators and segmented essential/non-essential busbars.
- Synchronism check (ANSI 25) and parallel-transition blocking, so that sources which must not be paralleled are blocked from closing together.
- Generator sequencing — start/stop scheduling, run-on and cool-down cycles, and load acceptance steps.
- Pre-transfer load tripping — shedding non-essential feeders before the bus-tie closes, to avoid overloading a single transformer or generator on transfer.
- Control circuit integrity — anti-pumping, trip circuit supervision, DC supply monitoring and breaker position discrepancy alarms.
- Operator interface — dynamic single-line mimic, source health status, auto/manual override, adjustable transfer timers and alarm history.
What you receive
- TIA Portal application (.zap archive) in structured LAD and SCL with IEC-compliant tagging
- KTP-series HMI project with the mimic, override and timer screens
- Control philosophy document and cause-and-effect / trip matrix
- S7-PLCSIM simulation record covering the agreed transfer cases and failure scenarios
- PLC I/O assignment schedule cross-referenced to the panel schematics
Standards and references
Transfer schemes are engineered to IEC 60947-6-1 for transfer switching equipment and IEC 61131-3 for control logic, with synchronism check following the applicable IEEE C37 practice and the project's transfer timing and interlocking specification.
Related services
Substation SCADA & ECMS
A monitoring layer over your MV and LV network that operators can actually act on.
Power Management & Fast Load Shedding
Fast, selective load shedding designed around the studied contingencies of islanded and captive networks.
Legacy PLC Migration & Retrofit
Moving obsolete switchboard controllers to current platforms, with the existing logic recovered and documented first.
Need this scoped?
Tell us about the switchboard, the source configuration and the specification you have been handed.
Get in Touch